Order Burner ChassisĪir Tube Length (dimension A) and Firing Rate or Air Tube Combination Code (see table). undo 2 screws that hold the big black transformer down in the center. Click your model to find parts, owner's manuals, diagrams and more. Designed for heavy duty continuous operation.Ĭonnector Tube Fitting – Special Beckett, high quality flare fitting.īurner Housing – Sturdy die cast, precisely machined aluminum housing aligns pump and motor for smoothest operation and longest coupling life. I am a contractor, so am pretty handy, and thought maybe this is something I can do with thee proper instruction. Ignition Transformer – 10,000 V/23 mA secondary positively and smoothly ignites fuel. Highly stable and intense combustion increases efficiency by as much as 35%.ĭrive Motor – Continuous duty, permanent split capacitor, built for daily hard use and years of trouble-free operation. Easy access, easy cleaning, permanent, washable filter. undo 2 screws that hold the big black transformer down in the center. I am a contractor, so am pretty handy, and thought maybe this is something I can do with thee proper instruction. Highly efficient, heavy-gauge heat exchanger, allowing for smoother airflow and quieter operation. I do know that when Ive had problems with the furnace in the past, they replaced the nozzle, and it seems to work. Nozzle Line Electrode Assembly – Self-centering, delivers oil to the nozzle, high voltage electricity to the electrodes static plate controls and evens out air flow to the head for smooth, efficient combustion.įlame Retention Head – One-piece flame retention burner head. Durable reinforced interlocking steel casing with powder coated finish.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |